1. <code id="2ndyz"></code>
    2. <code id="2ndyz"></code>

          <strike id="2ndyz"><sup id="2ndyz"></sup></strike>
          1. <th id="2ndyz"></th>
            <object id="2ndyz"><sup id="2ndyz"><mark id="2ndyz"></mark></sup></object>
            <object id="2ndyz"></object>
            1. <del id="2ndyz"></del>
            2. <th id="2ndyz"><video id="2ndyz"><span id="2ndyz"></span></video></th>

              萝卜视频在线观看手机版,萝卜视频大全完整版,男人的好资源在线,国产亚洲欧美日韩在线看片

              Welcome to【Jiangsu longchuang Electric Co., Ltd.】Official website!

              service Hotline:+86-18051358828/13382687004

              • Mobile
              • Wechat

              Relying on technological innovation and development,Build green smart distribution

              My position:Home - news - What preparations should be made before transformer maintenance?

              What preparations should be made before transformer maintenance?
              time:2018-10-12 10:22:28      click:822

              1. Consult the files to understand the operation status of the relevant transformers.

              1) the defects and exceptions (accidents) found in operation, the number and situation of short circuited exports;

              2) load, temperature and operation of auxiliary devices;

              3) consult the last overhaul summing up report and technical file;

              4) consult the test records (including oil analysis and chromatographic analysis) to understand the insulation status.

              5) check the leakage parts and mark them.

              6) carry out tests before overhaul and identify additional maintenance items.

              2. The major contents of the overhaul technology and organization plan are as follows:

              1) personnel organization and division of labor;

              2) construction project and schedule.

              3) construction plan for special projects;

              4) ensure construction safety and quality technical measures and on-site fire prevention measures;

              5) the main construction tools, equipment list, main materials list;

              6) draw up the necessary construction drawings.



              Prev:Advantages and disadvantages of amorphous alloy transformer
              Next:nothing!

              go back

              CONTACT US

              Find us

              Jiangsu longchuang Electric
              Co., Ltd.

              Mobile:+86-18051358828

              Tel:0516-86922188

              E-mail:LTELEC2008@163.COM

              Website:www.leixini.com

              Add:Intersection of North Ring Road and Hongqi Road, Pizhou(Amorphous City)

              RELATED NEWS

              What you are interested in

              萝卜视频在线观看手机版,萝卜视频大全完整版,男人的好资源在线,国产亚洲欧美日韩在线看片